Assignment: Technical assistance in Tanzania – maintenance of solar measurement stations.
Context: The World Bank (WB) initiated a project in early 2017 to support the East African Power Pool (EAPP) and some of its member countries in carrying out renewable energy resource assessment and mapping, with funding from the Energy Sector Management Assistance Program (ESMAP).
This assignment is an extension and covers the planning, commissioning, implementation, and decommissioning of a high-quality solar measurement campaign at eight sites, in Kenya (3 sites), Tanzania (3 sites, of which one exists already), and Uganda (2 sites), including monthly delivery of bankable solar data over a two-year period for each site.
- Tanzania (Dar es Salaam, Dodoma, Shinyanga, Makunduchi-Zanzibar)
- GeoSUN Africa / World Bank
- 2018 - ongoing
Our Projects
- Mini-grid company full-suite assistance
- Tanzania-wide village identification
- Regional Off-Grid Solar Market Assessment & Private Sector Support Facility Design (ROGEP)
- Renewable Energy Project Development Consulting
- Tender Agent services for AFD – Densification Round 2B and Hybridization of 2 Power Plants
- ESMAP – Solar Measurement Campaign in East Africa
- ESMAP – Small Hydro Resource Mapping for Tanzania
- ESMAP – Solar Power Resource Mapping in Tanzania
- Development of two 1MWp Solar PV plants connected to mini-grids
- Large-scale solar/wind/biomass renewable energy feasibility study
- Preparation of an off-grid electrification roadmap and the design of results-based financing instruments, Mozambique
- Feasibility study for the Zambia deployment of microgrid units project